Independent MEP testing and commissioning across Dubai and the UAE — electrical testing, HVAC balancing, plumbing pressure testing, ELV verification, snag closure, and complete handover documentation.
Testing & Commissioning
The work is not done
until it is verified
Testing and commissioning is the step that confirms MEP systems are actually ready before a client starts using the space. PowerCraft MEP tests every discipline it installs — electrical, HVAC, plumbing, and ELV — and closes out every snag before handover.
Our engineers work to the same standards applied on our electrical and HVAC projects: measured results, recorded values, and documentation that stands up to consultant review and authority pre-commissioning inspections. Read our pre-handover testing & commissioning checklist for the full sequence.
Scope Includes
- ✓Insulation Resistance Testing
- ✓Loop Impedance Testing
- ✓RCD Testing
- ✓Phase Rotation Checks
- ✓DB Inspection & Labelling
- ✓HVAC TAB Balancing
- ✓Plumbing Pressure Testing
- ✓ELV & CCTV Verification
- ✓Snag Logging & Closure
- ✓Test Packs & Reports
What We Cover
Full-Scope
T&C Capability
Every building system tested, balanced, and documented — one accountable team.
01
Electrical Testing
DB inspection, labelling, continuity, polarity, insulation resistance, loop impedance, RCD testing, phase rotation, and circuit function checks — every circuit verified before energisation is signed off.
02
HVAC Commissioning & TAB
Cooling operation, airflow measurement and balancing (TAB), thermostat response, drain line condition, and noise checks — with practical access left in place for future maintenance.
03
Plumbing Pressure Testing
Pressure testing, leak checks, line flushing, and fixture operation testing across water supply and drainage networks before walls and ceilings are closed.
04
ELV & CCTV Verification
Cameras, recorders, remote viewing, network points, intercom, and access control all checked for basic functionality against the installed design.
05
Snag Closure
Issues found during testing are logged, fixed, and re-checked — a proper site inspection earlier in the project significantly reduces the snag count at this stage.
06
Test Packs & Documentation
Complete test packs, commissioning reports, and as-built documentation issued at handover, supporting DEWA and Civil Defence pre-commissioning inspections.
How We Work
Our Commissioning
Process
Pre-Commissioning Checks
Installation completeness checks, DB labelling, cable schedule verification, and readiness review before any system is energised or filled.
Functional Testing
System-by-system functional tests — electrical circuits, HVAC operation and airflow, plumbing pressure, ELV and CCTV function.
Balancing & Calibration
HVAC air and water balancing (TAB), controls calibration, and set-point verification against the design intent.
Snagging & Re-Checks
Every defect logged, rectified, and re-tested until the snag list is closed out.
Handover Documentation
Test packs, commissioning reports, and O&M documentation issued, with authority inspection witness where required.
Who We Work With
Testing & Commissioning for Every Sector
Serving all UAE — Dubai · Abu Dhabi · Sharjah · Ajman · RAK · Fujairah · UAQ
Common Questions
Testing &
Commissioning FAQ
Short answers for clients planning project handover across the UAE.
WhatsApp Us →What does MEP testing & commissioning include?
Electrical testing covers DB inspection, labelling, continuity, polarity, insulation resistance, and circuit function. HVAC commissioning checks cooling operation, airflow, thermostat response, and drain lines. Plumbing is pressure-tested and checked for leaks, and ELV/CCTV systems are verified for recording, remote viewing, and basic function before handover.
Why is testing & commissioning done before handover?
Testing and commissioning is the step that confirms MEP systems are actually ready before a client starts using the space. Skip it or rush it, and problems that should have been caught on-site become the client’s problem after they have already moved in.
What electrical tests do you carry out?
Insulation resistance testing, loop impedance, RCD testing, phase rotation checks, lux measurements, and power quality analysis — with complete test packs and commissioning reports issued at handover.
What happens to snags found during commissioning?
Any issues found are logged, fixed, and re-checked, then handed over with clear documentation — this is what turns "the work is done" into "the work is verified".
Do you provide testing documentation for authority inspections?
Yes. Complete test packs, commissioning reports, and as-built documentation are issued at project handover and support DEWA and Civil Defence pre-commissioning inspections.
Need verified
handover in UAE?
Share your project scope — we'll respond within 24 hours and arrange a site visit where needed.