Full-scope HVAC contracting across Dubai and the UAE — AC installation, ducting, ventilation, chilled water systems, VRF/VRV, AHU/FCU, thermostat controls, testing, commissioning, and AMC support for every project type.

14+
Years in UAE
450+
Projects Delivered
48°C
Designed For
24/7
AMC Support

HVAC & Ventilation Contracting

From load calculation to commissioning —
cooling systems that perform through UAE summers

In a region where outdoor temperatures exceed 48°C, HVAC is not a commodity — it's a building's most critical system. PowerCraft MEP approaches every HVAC project with correct load calculations, coordinated shop drawings, quality equipment selection, and disciplined commissioning that produces real performance data — not just a sign-off form.

We install and commission HVAC systems for all sectors — residential villas and apartments, hotel fit-outs, office and retail projects, restaurants, warehouses, data centres, hospitals, and large commercial developments. Our teams have extensive experience with district cooling connections, VRF multi-zone systems, central AHU plant, and ducted FCU fit-outs across all Dubai authority zones.

Post-handover, our AMC team provides planned preventive maintenance, filter and coil servicing, refrigerant management, drain line flushing, and emergency breakdown cover — keeping your HVAC systems running reliably and efficiently year-round.

Scope Includes

  • ✓Split & Cassette AC Installation
  • ✓VRF / VRV Multi-Zone Systems
  • ✓AHU & FCU Supply & Install
  • ✓Chilled Water Pipework & Plant
  • ✓District Cooling HIU & Metering
  • ✓GI & Flexible Ductwork
  • ✓Mechanical Ventilation
  • ✓Kitchen & Car Park Exhaust
  • ✓Smoke Control & Pressurisation
  • ✓TAB — Airflow Balancing
  • ✓Testing, Commissioning & O&M
  • ✓AMC & Maintenance
Request A Proposal →
HVAC

What We Cover

Full-Scope HVAC
Capability

Every HVAC technology and application — one contractor, one point of accountability.

01

AC Installation

Split AC, cassette, ducted, package unit, and FCU installation for residential and commercial spaces — with correct refrigerant piping, condensate routing, electrical connections, thermostat wiring, and drain testing before handover.

02

Ducting Works

GI rectangular and spiral ductwork, flexible duct connections, insulation, diffuser installation, access doors, and coordinated duct routing across false ceilings — installed with clean MEP coordination to avoid conflicts with plumbing, electrical, and fire.

03

Ventilation Works

Fresh air units, exhaust systems, toilet and pantry ventilation, commercial kitchen hood ventilation, car park exhaust, smoke control, and stairwell pressurisation — designed and installed to UAE Civil Defence and municipality code requirements.

04

Chilled Water Systems

District cooling HIU connections, chiller plant rooms, primary and secondary chilled water pipework, cooling tower systems, BTU metering, insulation, and full commissioning for large commercial towers, hotels, and mixed-use developments.

05

VRF / VRV Systems

Multi-zone variable refrigerant flow systems for offices, retail fit-outs, restaurants, and mid-rise residential — including load zoning, indoor unit placement, refrigerant piping, controls integration, and full system commissioning.

06

AHU & FCU Installation

Air handling units and fan coil units — supply, rigging, installation, chilled water valve package connections, condensate drain piping, control wiring, and commissioning data for all unit types across commercial and hospitality projects.

07

Thermostat & Controls

Thermostat wiring, replacement, configuration, and basic BMS interface checking — ensuring temperature set-points, zone controls, and scheduling are correctly set up for comfort and energy efficiency from day one.

08

HVAC Maintenance & Fault Finding

Preventive and corrective maintenance covering filter cleaning, coil inspection, drain line flushing, refrigerant checks, condensate pan cleaning, and cooling performance diagnosis — with AMC packages available.

How We Work

Our HVAC
Project Process

01

Site Inspection

We inspect the site, review AC locations, existing units, duct routes, ceiling heights, ventilation requirements, and comfort needs before any scope is agreed.

02

Load Calc & Scope

Cooling loads calculated to UAE ASHRAE design conditions. Detailed HVAC scope, BOQ, equipment schedule, and quotation prepared with AC points, duct routes, and diffuser locations clearly listed.

03

Shop Drawings

Coordinated HVAC shop drawings and schematics cross-referenced with structure, electrical, plumbing, and fire services to prevent site conflicts before work begins.

04

Installation

Experienced HVAC crews execute equipment installation, ductwork, insulation, piping, thermostat wiring, and electrical rough-in — coordinated with fit-out, ceiling, and other MEP teams.

05

Testing & Handover

Airflow balancing, refrigerant charge verification, thermostat testing, drain checking, and snag closure — with commissioning data packs and O&M documentation issued at handover.

Who We Work With

HVAC Works for Every Sector

Villas & Residences
Apartment Towers
Offices & Business Centres
Restaurants & Cafes
Retail Shops & Showrooms
Hotels & Hospitality
Warehouses & Industrial
Supermarkets
Clinics & Hospitals
Data Centres
Fit-Out Contractors
Mixed-Use Towers

Serving all UAE — Dubai · Abu Dhabi · Sharjah · Ajman · RAK · Fujairah · UAQ

Technical Overview

HVAC Installation Services in Dubai & UAE

VRF & VRV Air Conditioning Installation Dubai

Variable Refrigerant Flow (VRF) and Variable Refrigerant Volume (VRV) systems are the preferred HVAC solution for offices, retail fit-outs, boutique hotels, and mid-rise residential buildings across Dubai. PowerCraft MEP designs and installs multi-zone VRF systems using leading brands, with precise load zoning, indoor unit placement, and refrigerant pipe sizing to manufacturer specifications. Our installations cover complete electrical connection, drain routing, commissioning, and BMS interface — delivering energy-efficient climate control without the infrastructure demands of a central chilled water plant.

Chilled Water Systems & District Cooling UAE

For large commercial towers, hotels, and mixed-use developments across Dubai and Abu Dhabi, chilled water HVAC systems deliver the capacity and reliability that split or VRF units cannot match. PowerCraft MEP installs primary and secondary chilled water pipework, cooling coil connections, plate heat exchangers, BTU metering, and full insulation. We are experienced with all major district cooling providers in Dubai — EMICOOL, Empower, and Tabreed — managing HIU installation, isolation valve packages, and commissioning data required by the provider. For projects with on-site chiller plants, we deliver the full mechanical room scope including pump sets, expansion vessels, strainers, and BMS sensor connections.

AHU, FCU & Ducted Split AC Installation

Air Handling Units (AHU) and Fan Coil Units (FCU) form the backbone of central HVAC systems in large buildings. PowerCraft MEP handles the full AHU/FCU installation scope — equipment positioning and rigging, chilled water valve packages, condensate drain piping, thermostat and control wiring, airflow balancing, and commissioning data packs. For ducted split AC systems, we size and install GI rectangular and spiral ductwork, insulate to UAE climate requirements, install supply and return diffusers, and commission airflow to design specifications. Our ductwork teams are experienced working in active fit-out sites alongside ceiling, joinery, and electrical trades with minimal programme impact.

Mechanical Ventilation, Exhaust & Smoke Control Dubai

Mechanical ventilation is a mandatory code requirement across almost all building types in the UAE — from residential apartments and car parks to commercial kitchens and server rooms. PowerCraft MEP installs fresh air systems, supply air units, toilet exhaust, car park ventilation, commercial kitchen hood extraction, and smoke control and stairwell pressurisation systems to UAE Civil Defence and municipality requirements. All ventilation designs are coordinated with fire system and electrical teams to prevent clashes and ensure life-safety compliance. Fan selection, duct sizing, fire damper locations, and BMS status points are all documented in our commissioning packs.

Common Questions

HVAC
FAQ

Short answers for clients planning HVAC installation, chilled water systems, maintenance, or project handover across the UAE.

WhatsApp Us →

Do you provide HVAC services across all UAE emirates?

Yes — PowerCraft MEP provides HVAC contracting across Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah, Fujairah, and Umm Al Quwain for all project types.

What HVAC systems and services do you cover?

We support AC installation, ducting, ventilation, chilled water systems, VRF/VRV, AHU, FCU, split units, thermostat controls, TAB airflow balancing, testing, commissioning, and HVAC maintenance.

Can you handle HVAC works for fit-out projects — offices, restaurants, retail?

Absolutely. We regularly deliver HVAC fit-out works for restaurants, cafes, retail shops, offices, supermarkets, hotels, and villa renovations — including duct modifications and authority sign-off coordination.

Do you work with district cooling connections in Dubai?

Yes. We are experienced with EMICOOL, Empower, and Tabreed district cooling connections — including HIU installation, chilled water primary pipework, valve packages, BTU metering, and full insulation.

Can you help with poor cooling, weak airflow, or AC faults?

Yes. We inspect filters, coils, drain lines, airflow distribution, thermostat settings, refrigerant charge, and controls to identify and fix cooling performance issues. AMC cover is also available.

How do I get an HVAC quotation or site inspection?

Share your project location, type, drawings or photos, existing equipment details, and scope via WhatsApp or our contact page. We will respond within 24 hours and arrange a site visit where needed.

Need an HVAC
contractor in UAE?

Share your drawings, equipment list, or project brief — we'll respond with an initial assessment within 24 hours and arrange a site visit where needed.